The following are some of our recent notable projects that have been completed and are in process.

Ventura Bay (Tampa) 
29 Buildings

The repair scope consisted of removing the improperly installed stucco over the frame on 29 2-story townhome buildings. Once the stucco was removed, any damaged and missing framing was repaired, new hold-downs and straps were added per engineering specifications, and the buildings were reconstructed and repainted. 

St. Charles Place Townhomes (Tampa)
55 Buildings 

This is a Paragraph. Click on "Edit Text" or double click on the text box to start editing the content and make sure to add any relevant details or information that you want to share with your visitors.

Paseo Condominiums (Ft. Myers)
50+ Units (22+ Buildings)

The repair scope consisted of removing the improperly installed stucco over the frame on thirty-one balconies, one whole building, and eleven lintel replacements over garages. Once the stucco was removed, any damaged and missing framing was repaired, new hold-downs and straps were added per engineering specifications, and the buildings were reconstructed and repainted. 

Flagship Condominiums (Sanford)
117 Units (39 Buildings)

The repair scope consisted of removing the improperly installed stucco over the frame on 39 2-story condominiums. Once the stucco was removed, any damaged and missing framing was repaired, new hold-downs and straps were added per engineering specifications, and the buildings were reconstructed and repainted.

Photo Oct 12, 2 39 11 PM.jpg

Schooner Cove Condominiums (Tampa)
195 Units (65 Buildings)

The repair scope consisted of removing the improperly installed stucco over the frame on 65 2-story condominiums. Once the stucco was removed, any damaged and missing framing was repaired, new hold-downs and straps were added per engineering specifications, and the buildings were reconstructed and repainted.

Cypress Creek Townhomes (Tampa)
116 Homes (24 Buildings)

The repair scope consisted of removing the improperly installed stucco over the frame on 24 2-story townhomes. Once the stucco was removed, any damaged framing was repaired, new hold-downs and straps were added per engineering specifications, and the buildings were reconstructed and repainted. 

20160826_095853.jpg
20231218_073534.jpg

Gainesville Project
Currently in progress


 

Repairing failing balconies, removing brick, repairing the underlying framing and reconstructing.

Central Florida Apartments 

The repair scope consists of removing the improperly installed stucco over the frame, repairing damaged framing, windows, reconstructing and repainting. 